Wentworth-Douglass Hospital Inpatient Bed Tower Project

Wentworth-Douglass Hospital Inpatient Bed Tower Project

Dover

Client

Wentworth-Douglass Hospital

Architect

Leo A. Daly

Structural Engineer

Leo A. Daly

General Contractor

Harvey Construction Corp.

Fabricator

Novel Ironworks

Erector

Rose Steel

Description

Five-story, 152,000 sf Hospital (Conventional vs. SidePlate®)

Challenges
  • To engineer a moment frame that met the ever-changing demands and functions of today’s hospitals, including open floor plans with the unrestricted capability to change wall partition locations, and a long narrow footprint without the opportunity for interior shear walls
  • With an anticipated completion date more than two years after the selection of the structural framing system, rising construction costs and a down-turning economy severely restricted the project budget
Solutions
  • SidePlate meant that smaller, fewer moment frames could be used than when using conventional steel moment-frame systems
  • SidePlate® saved 2.5psf in steel tonnage over conventional moment frame connections using W24x columns and 6psf using W14x columns